SuperWASP

Wide Angle Search for Planets

Search the SuperWASP site:

HOME

NEWS HOW IT WORKS TECHNICAL EXOPLANETS PUBLICATIONS MEDIA GALLERY

Quicklinks

 Members only: Pipeline group



Links to Data Statistics pages

ADS Tape stats
(wgaccess password)



ADS Tape naming convention for 2006:
SW-N raw data prefix 'N', processed data prefix 'Q'
SW-S raw data prefix 'S', processed data prefix 'K'
Test tapes prefix 'T'
The other 5 digits consist of: 1-digit year|2-digit month|2-digit day


SuperWASP Pipeline Description Document Version 0.99.5

Click here to download a gzip-compressed tarball of the latex and postscript files comprising the pipeline description. Unpack with the command: tar zxvf

Click here to download the postscript of the document.

SuperWASP Binary Format Specification Document Version 1.0.8
Click below to download the updated binary format spec:
Gzipped postscript
Latex file

Description of Post-Processing Algorithm
Click here to download the documentation for Andrew Collier Cameron's post-processing algorithm.

Documentation for Data Analysis Tools
WASPTF (gzipped postscript)
EXAMLC (gzipped postscript)
TAMUZ_PA (gzipped postscript)

Other tools available from CVS
pipe2cube (Tool to convert a set of archive per-star FITS files into a datacube (for Tamuz, examlc etc)
arc2cube (Tool to convert a set of pipeline per-image FITS tables into a datacube (for Tamuz, examlc, etc))
arc2txt (Tool to convert an archive per-star FITS file to an ASCII file (can be used in batch mode)

ADS Atlas Tape Naming Convention
All tapes on ADS are named according to the date of the night's data they contain, with a prefix indicating the data type. The date format is 1 character for the year, followed by two for the month and day. Therefore 2004-05-28 becomes '40528'.

The various prefixes are: (R)aw and (P)rocessed data. There are also prefixes of (T)est and (TN) (test-new) for various nights from previous re-reductions of the data.


Pipeline FITS I/O Upgrade Report
Click here to download Rachel Street's report on the FITS I/O upgrade as a gzipped ps.


Calibration Report

Click here to download Will Clarkson's report on the calibration procedure as a gzipped PDF.


WASP archive Data Report
Click here to download Peter Wheatley's third report on the data in the WASP archive as a gzipped PDF.
Click
here to download Peter Wheatley's second report on the data in the WASP archive as a gzipped PDF.
Click
here to download Peter Wheatley's report on the data in the WASP archive as a gzipped PDF.
Click
here to download Andrew Cameron's response to this report, also a gzipped PDF.


Memo regarding SW calibration frames (biases, flats and darks) from D. Christian and W. Clarkson.
Click here for postscript version
Click here for MS WORD format document


Minutes of Pipeline Group Meetings
Minutes of the telecon on 26th May 2005
Minutes of the telecon on 10th May 2005
Minutes of the telecon on 27th Apr. 2005
Minutes of the telecon on 25th Jan. 2005
Minutes of the telecon on 27th Oct. 2004
Minutes of the telecon on 17th Sept. 2004.
 
wasp@leicester
wasp@st. andrews
wasp@keele
wasp@QUB
SW-S live Status
 
 

Members Only:

WASP project
steering group
pipeline group
hardware group
archive group
resources
planets group

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


Home | News | How it works | Technical | Exoplanets | Publications | Media | Gallery | History | Collaborators | Map
 
University of Cambridge Isaac Newton Group, La Palma University of Keele Leicester University Queens University Belfast St. Andrews University